Pool Installation Process
What Heatwave Does for You
Before construction begins, we help you design your dream pool and plan the steps to bring it to life. We obtain the required zoning, building, and electrical permits and arrange for OUPS to mark underground public utility lines before excavation. We can also connect you with trusted electricians, hardscapers, landscapers, and other contractors we regularly work with to complete your backyard. Want to see how everything will come together? Ask an installation specialist about meeting with a 3D landscape designer.
During construction, we coordinate required inspections, keep you informed, and maintain a clean, organized jobsite. Once your pool is filled, our service team starts the equipment, and performs an initial water balancing. We then provide a complimentary “pool school,” walking you through equipment operation, water care, and routine maintenance so you feel confident caring for your new pool.
Our support continues long after your first swim. Our service department provides equipment repairs and support, along with seasonal pool openings and closings. All three retail locations offer free water testing and personalized recommendations to help keep your water balanced and clear. As a Hayward warranty station serving the Dayton–Cincinnati and Northern Kentucky area, we also assist with warranty support for eligible Hayward equipment.
Step 1: Get a Quote
Your pool project starts with one of our installation specialists, who will guide you from your first conversation through your completed pool. Ready to get started? Fill out our online “Get a Quote!” form, or call any of our three retail locations.
Your installation specialist will reach out to discuss your plans, pool options, and installation pricing, and answer your questions. From there, they’ll schedule a visit to your property to explore designs that fit your yard, preferences, and budget. At the end of the visit, you’ll receive quotes for the pool designs you’re interested in.
Step 2: Sign a Contract
Once you’ve reviewed your quotes and chosen your pool design, your installation specialist will arrange a convenient time and place to sign your installation contract.
Want to visualize your backyard before committing? Ask about working with a 3D landscape designer to preview your finished space.
After your contract is signed, your deposit toward pool materials secures your place on our installation schedule. This deposit remains refundable until your pool materials are ordered from the manufacturer. Changes to the signed contract may require a Change Order Form and could affect your installation price.
Step 3: Delivery & Excavation
Before and after your scheduled excavation, our team will begin delivering the materials and equipment needed for your pool installation. For vinyl liner pool deliveries, this include the steel panels used to build the pool’s structure. These materials can be stored in your garage, driveway or in your backyard.
Your installation specialist will also visit your property before excavation to stake out the pool’s location and take depth measurements for our excavation contractor. Excavation may take anywhere from a few hours to several days, depending on the pool’s size, ground conditions, groundwater, rock, and weather.
Step 4: Construction (Vinyl Liner)
Once excavation is complete, our construction team will assemble the steel wall panels to create your pool’s frame. The frame is carefully adjusted to the correct dimensions and elevation, then secured with rebar and a concrete footer around its base.
Next, we install the underground plumbing, skimmer, pool lights, and secure the bonding wire to the frame. We then begin the backfilling process. Once complete, your hardscaping contractor can begin work on the patio.
Our vermiculite crew then shapes and smooths the pool floor and deep-end slopes to prepare for the liner. Once the vermiculite has set, our liner installers fit the liner, begin filling your pool, and install the faceplates for the returns, skimmers, and lights.
Step 4: Construction (Fiberglass)
Once excavation is complete, our construction team prepares a gravel base to support your fiberglass pool shell. Typically, a day or two later, the shell arrives on a flatbed truck and is lifted into place with a crane. We then carefully position and level the shell before beginning the backfill process.
During backfilling, we gradually place gravel around the shell while adding water from a water truck to support it evenly. We also connect the underground plumbing, run conduit for the pool lights, and prepare the pool for bonding and inspection.
Following the inspection, we connect the underground plumbing to your pool equipment, install the lights, and add any purchased features. Once the equipment installation is complete, your electrician can complete the electrical connections.
Step 5: Servicing & Pool School
Once your pool is filled, one of our service technicians will start your pool equipment and begin balancing the water chemistry. When the water is ready for swimming, it’s time to enjoy your new pool!
We’ll care for your pool during its first week of operation, then provide your complimentary pool school. During this hands-on walkthrough, a service technician will explain how to operate your equipment, use your pool’s features, maintain balanced water, and keep your pool clean. We encourage you to take notes or record the session so you can easily refer back to the instructions whenever you need them.